290 West Hunt Club Rd.

Construction of a 40,000 sq.ft. retail base building consisting of five tenancies. Construction consisted of a concrete foundation with an overlying structural steel supplied & installed using the CANAM master approach. After two weeks of preconstruction value engineering Dolyn was able to provide the owner with cost savings on materials and design.

Previous project:
Next project: